Design, build & supply 2 hours fire rated Analyzer House complete with2x100% HVAC system suitable for operation in Hazardous Area Zone II

Emerson Process Management Distribution Limited
Abu Dhabi United Arab Emirates

i) Design, build, supply, install & commission 2×100% HVAC system suitable for Zone II
ii) Design, build, supply, install & commission 2×100% water chiller system suitable for Hazardous area Zone II

BASF Petronas Chemical Sdn Bhd
Kuantan Pahang

Design, build & supply 2 numbers Analyzer Houses each 9000Lx3000H & 6500Lx3000Wx3000H in SS304 material, complete with 1×100% HVAC system suitable for Hazardous area Zone II

Control Pooyan
Tehran Iran

Design, build, supply, install & commission 2×100% HVAC System for 2 Analyzer houses complete with 2×100% chemical filtration system in SS316 material, followed by special coatings and suitable for operation in Hazardous area Zone – I IIA/BT3

Emerson Process Management Distribution Limited
Abu Dhabi United Arab Emirates

Commissioning of HVAC System for 7 numbers control rooms for 1000MW coal fired power plant.

ALSTOM Services Sdn Bhd
Kuala Lumpur, Malaysia

Design, Build & Supply 6 numbers HVAC system for Analyzer Houses suitable for operation in Hazardous Area Zone II systems

Akıllı Çevrimiçi Dış Ticaret Limited Şirketi
Ankara Turkey

Design, Build & supply 20 units of chilled water fan coil units completedly fabricated in SS316L material, to supply fresh cool air in the firing of welding stations on board pipe laying vessel G1201.

Viking Airtech Pte Ltd
Singapore